New Turbine Control System for Unit No.4 Turbine in Zouk.
Scope included dismantling of old turbine controller, reverse engineering for the design of the new system, Supply of the new turbine controller taking into consideration all the parameters of the turbine. Scope included the supply of new vibration and expansion sensors. Installation, needed adpation and commissioning of the new system was as well part of our scope.Client:EDL ; Completion date: 2018
View all projects >
TALK TO AN EXPERT